Storage (Duration 8h)

8 unique locations (35 components)

Active MW: 5778.05 MW
Inactive MW: 0.00 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (5 components)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
40.07 MW
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (5 components)
• 40MW battery storage located near to the Coalburn North 400kV substation.
• 50MW battery storage located near Coalburn North 400kV substation.
• Lithium ion battery storage plant
Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h) ZENOBE COALBURN LIMITED New Build Generating CMU Coalburn unit 1 Coalburn unit 2 Not Prequalified ML11
Active • 2028-29 (T-4), 2027-28 (T-4)
114.39 MW
Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (3 components)

A Battery Energy Storage System. (2)

Storage (Duration 2h) Storage (Duration 8h) PD688IRO LTD PD503HAN LTD New Build Generating CMU Minety 2 Southfields 1 +1 more SN16
Active • 2028-29 (T-4), 2025-26 (T-4)
79.30 MW
Land at Somerford Farm, SN16 9RN (4 components)
• A Battery Energy Storage System (2)
• A Battery Energy Storage System.
Storage (Duration 2h) Storage (Duration 8h) PD813ETY LTD PD688IRO LTD New Build Generating CMU Minety 3 Minety 3 +2 more SN16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.18 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.20 MW
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (2 components)

A Battery Energy Storage System. (2)

Reciprocating engines Storage (Duration 8h) HB411MIN LTD New Build Generating CMU Dogtrap Minety SN16
Active • 2028-29 (T-4), 2024-25 (T-4)
39.65 MW
Land 475m NW of Hillcrest Cottage, Shebster KW14 7QY (1 component)

New build BESS to be installed within a future Greener Grid Park.

Storage (Duration 8h) STATKRAFT UK LTD New Build Generating CMU Not Prequalified KW14
Active • 2028-29 (T-4)
15.28 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (7 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage).
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage).
Storage (Duration 8h) First Hydro Company Existing Generating CMU Dinorwig Unit 1 Dinorwig Unit 1 +5 more LL55
Active • 2024-25 (T-1), 2017-18 (T-1)
185.38 MW